ASSET TYPE Metric Name Description Target Value UnitOfMeasure Priority Level Penalty Clause
Metric Name Target Value
Building Assets Access Control Availability System uptime percentage 99 Percentage High N$100 per 1% below target
- Access Control Availability 99
Building Assets Elevator Downtime Maximum total downtime per month 3 Hours Critical N$500 per additional hour
- Elevator Downtime 3
Building Assets Fire Alarm Inspection Frequency Interval between preventive checks 30 Days Medium N$200 per missed inspection
- Fire Alarm Inspection Frequency 30
Building Assets HVAC Response Time Time to attend to air conditioning faults 2 Hours High N$250 per hour delay
- HVAC Response Time 2
Building Assets Security Camera Recovery Maximum repair turnaround for camera failures 24 Hours Medium N$150 per camera delayed
- Security Camera Recovery 24
Fleet Assets Breakdown Response Time to dispatch mechanic after breakdown 1 Hours Critical N$500 per hour delay
- Breakdown Response 1
Fleet Assets Fuel Efficiency Minimum acceptable fuel economy 12 Km/L Medium 5% deduction per unit below target
- Fuel Efficiency 12
Fleet Assets Inspection Compliance Percentage of vehicles passing inspection 100 Percentage High N$200 per failed inspection
- Inspection Compliance 100
Fleet Assets Maintenance Turnaround Time to complete scheduled servicing 48 Hours Medium N$100 per delayed service
- Maintenance Turnaround 48
Fleet Assets Vehicle Availability Percentage of time vehicle is operational 95 Percentage High N$200 per day unavailable beyond target
- Vehicle Availability 95
Industrial Equipment Downtime per Month Maximum allowable downtime 2 Hours High N$500 per hour over target
- Downtime per Month 2
Industrial Equipment Emergency Response Time Time to respond to urgent maintenance calls 1 Hours Critical N$1,000 penalty for missed target
- Emergency Response Time 1
Industrial Equipment Mean Time Between Failures (MTBF) Average uptime between two failures 200 Hours Medium Service credit of N$200 if below target
- Mean Time Between Failures (MTBF) 200
Industrial Equipment Mean Time to Repair (MTTR) Average time to repair equipment after failure 6 Hours High N$300 per hour beyond SLA
- Mean Time to Repair (MTTR) 6
Industrial Equipment Preventive Maintenance Completion Percentage of scheduled PM tasks completed on time 95 Percentage Medium 2% of contract value per missed PM
- Preventive Maintenance Completion 95
IT Equipment Backup Success Rate Percentage of scheduled backups completed successfully 98 Percentage Medium 0.5% fee deduction per 1% shortfall
- Backup Success Rate 98
IT Equipment Network Latency Maximum acceptable network response delay 100 Milliseconds High $100 for every 10ms above target
- Network Latency 100
IT Equipment Patch Deployment Time Maximum delay for applying security patches after release 7 Days Medium $50 per missed patch cycle
- Patch Deployment Time 7
IT Equipment Resolution Time Maximum time to restore system functionality after outage 4 Hours High $250 per hour beyond target
- Resolution Time 4
IT Equipment Response Time Maximum time to respond to system outage alerts 1 Hours Critical $100 per hour of delayed response
- Response Time 1
IT Equipment System Uptime Minimum percentage of operational time per month 99.9 Percentage High 1% of monthly fee for each 0.1% below target
- System Uptime 99.9
Office Equipment Preventive Maintenance Completion rate of scheduled equipment checks 100 Percentage Low N$25 per missed maintenance
- Preventive Maintenance 100
Office Equipment Replacement Turnaround Time to replace failed device beyond repair 3 Days Medium N$100 per day beyond target
- Replacement Turnaround 3
Office Equipment Resolution Time Time to complete printer/copier repairs 8 Hours Medium N$100 per hour beyond SLA
- Resolution Time 8
Office Equipment Response Time Time to respond to printer/copier service requests 2 Hours High N$50 per hour delay
- Response Time 2
Office Equipment Toner Supply Lead Time Maximum delay in replacing toner cartridges 24 Hours Medium N$50 per delayed replacement
- Toner Supply Lead Time 24
Utility Systems Maintenance Schedule Compliance Completion of planned maintenance activities 95 Percentage Low N$50 per missed maintenance
- Maintenance Schedule Compliance 95
Utility Systems Power Restoration Time to restore power after outage 2 Hours Critical N$500 per hour delay
- Power Restoration 2
Utility Systems System Alert Response Time to acknowledge and act on system alarms 15 Minutes High N$100 per missed alert
- System Alert Response 15
Utility Systems Temperature Compliance % of time within allowed temperature range 98 Percentage Medium N$100 per 1% deviation
- Temperature Compliance 98
Utility Systems Water Supply Continuity Minimum uptime percentage 99.5 Percentage High N$200 per 0.5% below target
- Water Supply Continuity 99.5